Build a practical migration scope
For a Hamilton facility with an existing access system, record controller, reader and credential details before assuming equipment can be reused. Include any access interruptions that operations can tolerate and how temporary access would be handled during a cutover. This helps a dealer distinguish assessment work from the final installation scope.
Include these details in your enquiry
- Record existing controller and reader model numbers where available.
- Describe the operational window for a cutover.
- List credentials, doors and access policies that must be migrated.
Compare the full installation scope
Ask the dealer to identify the door hardware, readers, controllers, cabling, software subscriptions, commissioning and training included in the proposal. If equipment is being retained, distinguish confirmed compatibility from assumptions that still require inspection.
For a project in Hamilton involving more than one building, include a door count and current system for each location. Confirm site access, permitted work hours, account ownership and support arrangements before approving the work.